Do I need a permit for an extension, canopy or balcony glazing in Bulgaria?

We assess whether the extension, canopy, garage, fence or glazing you are planning needs a building permit, a full design or only a design solution. We prepare notarial contracts with co-owners and consents in condominium buildings, and defend you if the municipality draws up a statement of findings. The first consultation is free of charge.

Most unlawful structures we see are not new houses but something small: an extension to a holiday home, a carport, a garage by the fence, a glazed terrace joined to a room. The owner was usually sure that no documents were needed for such work, until the municipality drew up a statement of findings (констативен акт) or a buyer walked away from the deal.

The Spatial Planning Act (Закон за устройство на територията, ЗУТ) has an answer for each of these cases, but it often does not match intuition, and the difference between a lawful and an unlawful structure can be a few centimetres of height. As spatial planning lawyers in Sofia, we assess the case before it becomes a problem. Before you order the materials, call or write to us and we will go through exactly what you are planning.

When small works need a building permit

The rule is that all construction needs a permit unless the law expressly says otherwise (Art. 148(1) of the Spatial Planning Act). So the question is not whether you need a permit, but which of three groups the work falls into:

  • No permit - the works exhaustively listed in Art. 151(1), for example routine repairs that do not affect the structure, glazing of balconies and loggias, a light shed for firewood and tools, garden features up to 2.50 m, and a solid fence up to 0.60 m.
  • Permit, but no approved design - sixth-category works under Art. 147(1): most ancillary buildings, a swimming pool up to 100 cubic metres on a fenced plot, a solid fence from 0.60 to 2.20 m.
  • Permit and approved design - everything else, including extensions and additional storeys.

What is a design solution and why do I need one?

A design solution (проектно решение) is simplified documentation from a licensed designer that replaces the full investment design for sixth-category works (Art. 147(2) of the Spatial Planning Act). It is shorter and cheaper, but mandatory: without it no permit is issued. A table of the most common small works is in our article on extensions, canopies and balcony glazing.

Extension to a house or holiday home: permit and consents

An extension is new construction that increases the built-up area. It needs an approved investment design and a building permit whatever its size. The authorities check whether it is allowed by the detailed development plan and respects the setback distances and, if it affects the structure of the existing building, the permit is issued only after a survey of that building (Art. 148(13) of the Spatial Planning Act). We describe the procedure itself on the building permit page.

The legal risk is usually in the ownership. An extension on co-owned property requires a contract in notarial form with the other co-owners (Art. 183(1)), save for the exceptions in Art. 183(4). This contract also settles who owns the new part, so without it an extension built on trust between relatives often becomes a problem on inheritance or partition.

Can I build a small extension without a permit?

No. The law makes no exception for small extensions. An extension built without a design and permit is unlawful and may be demolished, whatever its floor area.

Canopies, garages, summer kitchens and workshops are ancillary buildings (допълващо застрояване, Art. 41(1) of the Spatial Planning Act). Most of them need a building permit, but usually without an approved design (Art. 147(1), item 1). Buildings used for production, trade or public services need a design.

Not every canopy falls into this group. A light shed for firewood and tools and garden features up to 2.50 m, such as a pergola or gazebo, need no permit (Art. 151(1), items 3 and 12). A roofed carport for two cars on a concrete foundation usually does. The line depends on the size and structure, so if in doubt ask the chief architect for a written opinion.

How far from the neighbour can I build a canopy or garage?

When freestanding, an ancillary building may be up to 3.60 m high and must be at least 3 m from the plot's internal boundaries. Buildings up to 2.50 m high may be 1.50 m from the southern, south-eastern and south-western boundary, and on the boundary itself if their blank wall covers a blank wall or solid fence on the neighbouring plot (Art. 42 of the Spatial Planning Act).

Balcony glazing and small works in an apartment building

Glazing balconies and loggias does not require a building permit (Art. 151(1), item 6 of the Spatial Planning Act). This covers only fitting window frames around an existing balcony. Removing the wall or parapet to the room where this affects the structure, bricking up the balcony, enlarging it or roofing a terrace with a new structure all require a design and a permit.

In a building in condominium ownership you also have to take the neighbours into account, not just the municipality. The facade, roof and yard are common parts. Owners may not spoil the building's architectural appearance (Art. 6(1), item 5 of the Condominium Management Act, Закон за управление на етажната собственост, ЗУЕС), and a canopy in the shared yard or an appropriated corridor is a prohibited taking of common parts (Art. 6(1), item 3 of the same Act). Extending a block or adding a storey requires notarised consents from all owners (Art. 183(2) of the Spatial Planning Act). More on rights and duties in the building is on the condominium page.

Can I join the balcony to the room?

Only under a design and, if the structure is affected, with a building permit. The wall under the window is often part of the load-bearing structure, and removing it is not routine repair. Ask a structural engineer for an opinion before you start.

Already built without a permit?

Construction without a permit or without the required design is unlawful (Art. 225(2), item 2 of the Spatial Planning Act), whatever its size. The consequences are a demolition order, a fine for those involved in the construction, and refusal of any new permit on the plot until the unlawful structure is demolished or legalised (Art. 148(7)).

If the structure was built before 31 March 2001, it may be tolerated (търпим). If it is newer, we check whether the work needed a permit at all and whether the deviation is substantial. The options are covered on the page on legalising a building.

What is the fine for building without a permit?

For a participant in construction who carries out, orders or allows unlawful construction, the fine is EUR 511.29 to 5,112.92 (BGN 1,000–10,000), unless another law provides a heavier penalty (Art. 232(2) of the Spatial Planning Act). Separately from the fine, the structure may be demolished.

What documents should you prepare?

  • The title document for the property or the apartment
  • A cadastral sketch and, if available, the building's approved designs
  • A description, dimensions and photos or a sketch of what you are planning
  • Details of the co-owners or of the condominium
  • Any statement of findings or letters from the municipality you have received

Who will handle your case

Frequently asked questions about small construction works

Do I need a permit for a fence?

It depends on the height and type. See-through fences and solid fences up to 0.60 m within the plot need no permit (Art. 151(1), item 11 of the Spatial Planning Act). A solid fence from 0.60 to 2.20 m needs a permit without an approved design (Art. 147(1), item 7).

Do I need a permit for a swimming pool in the garden?

A pool of up to 100 cubic metres on a fenced plot needs a building permit, but no approved design (Art. 147(1), item 4 of the Spatial Planning Act). Larger pools require a full investment design.

Do I need a permit for solar panels on my house?

Photovoltaic installations for own use of up to 20 kW on single-family houses and holiday homes need no permit (Art. 151(1), item 19 of the Spatial Planning Act). You must, however, notify the chief architect at least 14 days before installation, attach design solutions and file a declaration afterwards.

Do these rules apply in a protected area or to a listed building?

The rules there are stricter. For immovable cultural heritage and its buffer zones, even works that normally need no permit must be approved under the Cultural Heritage Act (Закон за културното наследство) (Art. 151(2) of the Spatial Planning Act).

Can I sell a property with an unlawful extension?

The sale is not expressly prohibited, but the buyer takes on the risk of a demolition order, and banks usually refuse a mortgage. It is therefore better to sort out the extension's status before the sale.

How do I defend myself if the municipality says my structure is unlawful?

You have 7 days to file written objections against the statement of findings (Art. 225a(2) of the Spatial Planning Act). Most often they show that the work falls under Art. 151, that documents exist or that the structure is tolerated. Do not lose those days in informal conversations with the municipality.