Building Permit in Bulgaria

We check title and the development plan, prepare the notarial contracts and consents of co-owners, appeal express or tacit refusals by the municipality and defend your permit when a neighbour appeals.

In short

How do I get a building permit in Bulgaria?

We assist owners and investors in Sofia and across Bulgaria with building permits: we check title and the detailed development plan, prepare the notarial contracts and the consents of co-owners and other owners in the building, and appeal express or tacit refusals. We also defend permits that neighbours appeal. The first consultation is free of charge.

A building permit (разрешение за строеж) is the document without which you generally cannot lawfully build a house, extend a building, add a storey or carry out major repairs that affect the structure (Art. 148(1) of the Spatial Planning Act, Закон за устройство на територията, ЗУТ). The application itself is usually filed by your architect or designer. The problems that stall a project for months are rarely technical: unclear title, a missing consent from a co-owner, a plan that does not allow what you have in mind, or a neighbour who appeals.

As spatial planning lawyers in Sofia, we step in before the design work, so the finished design does not turn out to be unusable, and after the municipality's decision, when there is a refusal, silence or an appeal. Call or write to us before you pay for the design.

What to check before applying for a building permit

The first step is legal: who owns the property and what the plan allows. We check the title document and any registered encumbrances, whether the property is co-owned, whether there are easements, mortgages or pending claims, and what the detailed development plan (подробен устройствен план, ПУП) provides: building lines, height, density and floor-area ratio. If you are buying a plot to build on, this check is part of property due diligence.

When the plan does not allow the building you want, the answer is to amend the plan, not a more creative design. An amendment is a separate procedure with its own deadlines and objections, which we cover on the page on the detailed development plan and its amendment.

Do I need a design visa?

A design visa (виза за проектиране) is an extract from the development plan showing the building parameters for your plot (Art. 140(2) of the Spatial Planning Act). It is mandatory only in the cases the law lists; otherwise it is optional. It is issued within one month of the application and is useful when the plan's parameters are not entirely clear.

Documents and consents for a building permit

The application for approval of the design must include the title document or the document establishing a right to build, a design visa or the utility companies' technical data, the investment design, a compliance assessment and, where needed, opinions under special laws (Art. 144(1) of the Spatial Planning Act). This part is usually handled by the designer.

Our work is in the documents a designer cannot prepare. For co-owned property, the law requires a contract in notarial form with the other co-owners for new construction, an extension or an additional storey (Art. 183(1)). To extend or add a storey to a building in condominium ownership, you need a contract for a right to build and notarised consents from all the owners (Art. 183(2)). We draft these contracts so that they also settle who will own the new part.

What happens if one co-owner does not agree?

Without their consent, a permit for construction affecting the shared property generally cannot be issued. The law allows some exceptions (Art. 183(4) of the Spatial Planning Act), and sometimes the solution is a voluntary or court partition of the property. We assess which route is realistic before you pay for a design.

How long a building permit takes

The deadlines for the authorities are short: one month for the design visa, 14 days or one month to approve the design depending on the type of assessment, and 7 days for the permit once the design is approved (Art. 144(3) and Art. 148(4) of the Spatial Planning Act). They do not include the design work, the opinions or correcting deficiencies, so in practice the procedure takes from several weeks to several months.

We track the deadlines for you. We keep the reference numbers, so it is clear exactly when the municipality must decide, and we act when it stays silent.

How long is a building permit valid?

It lapses if construction has not started within 3 years of the permit entering into force, or if the rough construction is not finished within 5 years of the start (Art. 153(2) of the Spatial Planning Act). It can be re-certified once, if you apply within 3 months of the deadline expiring.

Building permit refused: how to appeal

The municipality may refuse only on grounds of lawfulness and with specific reasons, not because it does not like the design. The most common grounds are non-compliance with the plan, insufficient setback distances, incomplete documents, a missing co-owner consent or an unlawful structure on the same plot (Art. 148(7) of the Spatial Planning Act).

An express refusal is appealed to the administrative court where the property is located within 14 days of being served, by a complaint lodged through the authority that issued it (Art. 215(1) and (4)). We analyse the reasons straight away: sometimes it is faster to fix the deficiency and apply again, and sometimes the refusal has to be overturned in court. A detailed checklist of documents and reasons for refusal is in our article on the building permit in Bulgaria.

What is a tacit refusal and how is it appealed?

When the municipality does not decide within the statutory deadline, its silence counts as a tacit refusal (Art. 58(1) of the Administrative Procedure Code, Административнопроцесуален кодекс, АПК). It can be appealed to the administrative court within two months of the deadline for a decision expiring (Art. 149(2) of the Code). If an express refusal arrives in the meantime, a separate 14-day deadline runs for it.

When a neighbour appeals a building permit

The permit is served on the interested parties, and for new construction, an extension or an additional storey the law lists them exhaustively: the client, the owners and the holders of limited property rights in the same plot (Art. 149(2), item 1 of the Spatial Planning Act). The owner of the neighbouring plot is not among them, so as a rule cannot appeal such a permit; for conversions the circle is wider (Art. 149(2), items 2–4). Interested parties can appeal within 14 days of service (Art. 215(4)). So do not start building before the permit enters into force: the site can be opened only under a permit in force (Art. 157(2)), and construction under a permit that is appealed and later annulled becomes unlawful.

If a neighbour has appealed your permit, we represent you in the case and defend the municipality's decision. If you are the neighbour, we check whether you are an interested party and whether the permit is lawful. If you are not, you can alert the Directorate for National Construction Control (ДНСК), which reviews the lawfulness of the permit within 14 days of being notified of it and can revoke it (Art. 156(1) and (5) of the Spatial Planning Act). The setbacks and height of the neighbouring building are usually settled earlier, in the detailed development plan, where neighbours are interested parties when reduced distances are allowed (Art. 131(2), item 3). Where the construction already interferes with your rights, a separate civil claim for the protection of ownership may also be possible.

Can a neighbour's building permit be revoked after it has entered into force?

Building permits that have entered into force cannot be revoked (Art. 156(8) of the Spatial Planning Act). What remains is control during construction: if the neighbour deviates from the approved design, you can report it to the municipality or to the Directorate for National Construction Control (ДНСК). A claim that the permit is null and void can still be brought without a time limit (Art. 149(5) of the Administrative Procedure Code), but it does not suspend the permit (Art. 156(6) of the Spatial Planning Act). That is why the 14-day deadline is decisive.

What documents should you prepare?

  • The title document or the document establishing a right to build
  • A cadastral sketch and, if available, a design visa or an extract from the development plan
  • The investment design or design solution, if already prepared
  • Contracts or consents from co-owners and from the other owners in the building
  • The refusal, letters from the municipality and the reference numbers of applications
  • In a dispute with a neighbour: the permit and the date it was served on you

Who will handle your case

Frequently asked questions about building permits

Who issues a building permit in Bulgaria?

As a rule, the chief architect of the municipality or, in large cities, of the district (Art. 148(2) of the Spatial Planning Act). For certain projects, for example those of national importance or covering more than one municipality, the regional governor or the Minister of Regional Development and Public Works is competent.

Can I start building as soon as the permit is issued?

It is not sensible. The permit must first enter into force, meaning the 14-day appeal period for interested parties has expired or any appeals have been dismissed. Construction then starts with a record opening the building site and fixing the building line and level.

Do I need a permit for major repairs or internal alterations?

Yes, if the structure is affected or the use of the rooms changes. Routine repairs that do not affect the structure do not need a permit. If in doubt, ask the chief architect for a written opinion before you start.

What do I lose if I do not apply for a permit within a year of the design being approved?

The approved investment design lapses if no building permit is applied for within one year of its approval (Art. 145(4) of the Spatial Planning Act). The design then has to be approved again.

Will I get a permit if there is an unlawful structure on the plot?

The person who built an unlawful structure on the plot does not receive a permit for new construction there until the unlawful structure has been demolished or legalised (Art. 148(7) of the Spatial Planning Act). That is why the status of older structures is checked at the outset.

Do I have to be in Bulgaria to obtain a building permit?

Not necessarily. Contracts and applications can be signed through an attorney-in-fact under a notarised power of attorney, and the notarisation can be done abroad, with an apostille, or at a Bulgarian consulate. A lawyer can also file an appeal with the court on your behalf.